Knowledge

Engineering notes written from the plant floor, how we size, select and troubleshoot water and wastewater systems. No marketing; numbers you can check.

Engineering calculators

STP sizing, ETP estimator, cooling tower balance, RO recovery.

Discharge norms

General standards, STP norms and reuse standards in one place.

Glossary

62 terms, one line each.

International discharge norms

India vs IFC vs EU vs US EPA treated sewage limits, with sources.

Operator checklists

Printable STP, ETP and RO checklists (PDF).

Design standards

Codes and guidelines we design to, and how local norms are handled.

RFQ checklist

What to send for a plant quote, with a one-page PDF.

STP site requirements

Land, levels, power and permits to confirm before you order.

Water analysis guide

What to test and how to sample for plant design.

Leachate, 19 September 2026

Landfill Leachate Treatment: How to Size, Select and Budget an LTP

A practical guide to leachate treatment plant design, characterising leachate, choosing between MBR, DTRO, ammonia stripping and evaporation, sizing for monsoon flows, and what drives capital and operating cost per KLD.

FSTP, 19 September 2026

How to Plan a 10–50 KLD Faecal Sludge Treatment Plant (FSTP)

FSTP design for small towns: estimating septage load from population and desludging cycle, land requirement, choosing between drying beds and mechanical dewatering, liquid treatment options, and what a co-treatment unit at an existing STP needs.

ZLD, 19 September 2026

Why ZLD Plants Cost Too Much to Run, and Seven Ways to Cut the OPEX

Zero liquid discharge operating cost explained: where the money goes in a ZLD train, why the evaporator size decides everything, and seven engineering measures, segregation, high-recovery RO, MVR, salt recovery, that reduce ZLD OPEX.

High-purity water, 19 September 2026

Pharmaceutical Purified Water Systems: Design, Validation and the Failures We See Most

How a compliant purified water (PW) generation and distribution system is designed, pre-treatment, RO, EDI, UV, storage and loop, what USP/IP/EP require, how validation (DQ, IQ, OQ, PQ) is structured, and the recurring reasons PW systems fail audits.

STP, 19 September 2026

MBBR vs SBR vs MBR: Choosing a Sewage Treatment Plant for a Housing Society, Hotel or Campus

A decision guide for STP technology selection, how MBBR, SBR and MBR differ in footprint, capital cost, power, operator skill and outlet quality; how to size an STP from occupancy; and the questions to ask any vendor before you buy.