Leachate is the liquid that drains through a landfill or dumpsite as rain and waste moisture percolate through decomposing refuse. It carries everything the waste releases: dissolved and colloidal organics (COD 2,000–60,000 mg/L), ammoniacal nitrogen (500–3,000 mg/L), chlorides and total dissolved solids often above 10,000 mg/L, heavy metals, colour and refractory humic compounds that biology alone cannot break down.
Its character changes with the age of the landfill: young leachate is acidic and highly biodegradable (BOD/COD > 0.5); old, stabilised leachate is alkaline, dark and refractory (BOD/COD < 0.1) with most of the COD locked in humic acids. A leachate treatment plant therefore has to be designed for the specific site, its age and its monsoon flow variation — not from a catalogue.
KK Enviro Engineers designs and builds leachate treatment plants (LTP) for municipal solid-waste landfills, legacy dumpsite bio-mining and capping projects, waste-to-energy plants, compost yards, and secured landfills for hazardous industrial waste (TSDF).
Extended-aeration membrane bioreactor — the workhorse for leachate biology; compact and tolerant of load swings.
Open-channel RO built for high-TDS, high-fouling leachate; 75–80 % recovery in two stages.
Packed-tower air stripping with acid scrubber where nitrogen is far above what biology can nitrify economically.
Advanced oxidation for refractory COD and colour in stabilised leachate.
Chemical-free pre-treatment and COD reduction for remote sites with difficult chemical logistics.
Multiple-effect or mechanical-vapour-recompression evaporation for RO concentrate and ZLD.
Low-energy polishing for small, dilute leachate flows where land is available.
Complete plant in 20 ft / 40 ft containers — 20 to 500 KLD, shipped and commissioned in weeks.
Inlet characterisation and sampling plan → process selection and mass balance → PFD, P&ID, hydraulic and equipment sizing → civil and mechanical drawings → BOQ, vendor RFQs and procurement → erection supervision → commissioning, performance guarantee test and operator training → operation & maintenance. Delivered as a containerised or skid-mounted package for small and remote sites, or as a site-built turnkey plant for large capacities. Documentation to refinery-grade standards: datasheets, interlock lists, cause-and-effect matrices and O&M manuals your team can actually run the plant from.
Very high COD and ammonia, high salts, heavy metals, and refractory organics that biology cannot break down — with quality that changes with landfill age and flow that changes with rainfall.
Usually a train of equalisation, ammonia removal, membrane bioreactor (MBR), disc-tube RO (DTRO) and concentrate handling. Advanced oxidation is added for old, stabilised leachate.
It is either recirculated to the landfill where the licence permits, or concentrated in an evaporator to solid residue (ZLD). The reject route must be decided at design stage — it is 20–30 % of the flow.
Yes — 20 to 500 KLD in 20 ft / 40 ft containers, suited to legacy dumpsite remediation contracts where the plant moves to the next site after two to four years.
Send your leachate analysis, expected flow and site details — we reply with a treatment scheme, footprint and budget range within one working day.