Treated sewage limits from India, IFC, the EU and the US side by side, and how to decide which one governs your project.
Limits for treated sanitary sewage from each source. They are not like-for-like: each source uses its own basis, as explained below the table.
| Parameter | India (new STP, tighter set) | IFC EHS (2007) | EU UWWTD | US EPA secondary |
|---|---|---|---|---|
| pH | 6.5 to 9.0 | 6 to 9 | not set in Annex I | 6.0 to 9.0 |
| BOD (mg/L) | 10 | 30 | 25 (or 70 to 90% reduction) | 30 (30-day avg), 45 (7-day avg), 85% removal |
| COD (mg/L) | 50 | 125 | 125 (or 75% reduction) | not set |
| TSS (mg/L) | 20 | 50 | 35 (optional requirement) | 30 (30-day avg), 45 (7-day avg), 85% removal |
| Total nitrogen (mg/L) | 10 | 10 | 15 or 10 in sensitive areas (by size) | not set |
| Total phosphorus (mg/L) | not set | 2 | 2 or 1 in sensitive areas (by size) | not set |
| Oil and grease (mg/L) | not set in table | 10 | not set | not set |
| Coliform | Faecal coliform 230 MPN/100 mL permissible | Total coliform 400 MPN/100 mL | not set in Annex I | not set |
Sources: Indian values as on our India discharge norms page; IFC General EHS Guidelines (2007) indicative values for treated sanitary sewage, as reproduced in a JICA report; EU Directive 91/271/EEC Annex I; US 40 CFR 133.102.
Standards are amended. Verify every value against the current official text and your authority notification before you finalise a design. We can do this check as part of a proposal: send your RFQ details and any specification.
Agree a reference with the client in writing. A common approach is the stricter of the local limit and the IFC indicative values. It also depends on the receiving water and any reuse.
No. They differ in values and in how they are expressed, as percentages or averages. Compare them using the table and the notes, not number against number.
Yes. Each plant is designed backwards from the limit that binds. Send the limit with your water data and we tell you which stages it needs.
Send your location, flow and any permit or specification. We reply within one to two working days.