A plant is only as good as the water data it was designed from. This is how to get an analysis we can design on.
Use a recognised, accredited laboratory, and ask for the method used for each parameter. For discharge consent, your pollution control authority may require a specific approved lab. If you are unsure, send us the process description and we will tell you which parameters matter.
Send the report with the RFQ checklist. Related tools: calculators and discharge norms.
Rarely, for industrial effluent. Variable discharge needs composite and peak samples. For steady raw water, one good sample plus a seasonal check is usually reasonable.
We can give a first scheme from flow and process description, but we fix the design only after a proper analysis.
Tell us the process and the chemicals used. We may suggest a pilot or jar test before final design.
Send the report and flow. We reply with a scheme and budget range within one to two working days.